Develop plans, specifications, and estimates for construction. Submittals to include Stage II (scoping letter with initial drainage report), Stage III, Stage IV, and bid ready documents. Perform aerial survey and mapping as needed. Environmental analysis and technical reports to support ADOT EP in providing the Categorical Exclusion. Utility coordination as required for U&RR clearance. Right‐of‐way coordination as required for R/W clearance. No new R/W or TCE’s are anticipated. Provide support to the ADOT Contracts and Specifications Group for bid advertisement. Conduct management and administrative tasks including coordination, meetings, schedule updates, comment responses. Document retention, project schedule, and risk register updates within the Workfront platform is required. The design of the project will meet or exceed AASHTO, FHWA, ADOT, and MUTCD standards.