Specifications include, but are not limited to: Existing distribution panels (fuse panels, sub panels, switch gear etc.), and SES panel will be removed and replaced with equipment that meets or exceeds the performance specifications of the existing equipment. Additionally, some shop outlets will be upgraded in order to make them compatible with modern shop equipment. Contractor will coordinate with electrical service provider (SRP) to bring service entrance configuration up to code before tying in the new SES panel. Existing wire is adequate and will not be required except where outlets in shop must be upgraded. 2.1.1 Base Bid: Contractor shall provide a complete firm fixed price to provide all necessary materials, services, labor, and equipment to perform the electrical upgrades. Complete installation and construction requirements are specified and outlined in this Summary of Work. 2.1.2 Bid Scope: 2.1.2.1 Primary Utility Room 2.1.2.1.1 Remove and replace Three (3) 42-space, 3-phase, 225 A circuit breakers 2.1.2.1.2 Integrate 30+12-space panels into 60-space, 225 A panel 2.1.2.1.3 Replace distribution panels. Include the following: 2.1.2.1.3.1 Two (2) X 30 A Switches 2.1.2.1.3.2 Four (4) X 60 A Switches 2.1.2.1.3.3 Two (2) X 100 A Switches 2.1.2.1.3.4 Four (4) X 200 A Switches 2.1.2.1.4 Replace Two (2) X 100 A, 3-phase disconnect switches 2.1.2.2 Kitchen/Break Area 2.1.2.2.1 Remove distribution and switching for hoist and evaporative coolers from chain link wall 2.1.2.2.2 Frame/sheet rock existing chain link wall. Include taping, texturing, and painting