Specifications include, but are not limited to: The scope of work will include, but is not limited to: street widening, construction of new sidewalks and Americans with Disabilities Act ramps, modifying pedestrian circulation and improve crosswalks, gate arms locations and existing islands upgrades, traffic signal equipment and streetlighting upgrades, traffic signal preemption time and programing, cantilever signals and railroad equipment upgrades, realignment of exiting traffic lanes configuration, right-of-way and bus stop area assessments. The design scope submittal consists of Preliminary Engineering (PE) deliverable and the Final Design (FD) package. The PE deliverable consists of the preparation of all design development and project delivery documentation necessary to demonstrate the effectiveness, feasibility, and readiness of the project. Additionally, the scope of the project includes post-design services extending through the construction phase to ensure seamless implementation and successful project completion.