Specifications include, but are not limited to: a) Develop a work plan with all tasks including and not limited to: data collection, Building Information Models (BIM) usage, site utilization, design milestone phases with their activities and dates, task responsibilities, required timeframes, and estimates of required timeframes. b) Attend Project kickoff meetings, the first of which shall be for the purpose of consulting in detail with County staff to discuss status, review plans and other documents, understand all requirements including, but not limited to any design, construction, scheduling, budget, operational needs, restrictions, and requirements. Key project team members will be introduced. Roles and responsibilities reviewed. Pertinent information identified. c) Provide feedback/input and assessment for site utilization and construction logistics as depicted in the schematic design.