Specifications include, but are not limited to: Division 1: General RequirementsMobilization/DemobilizationLS1Traffic ControlLS1Construction StakingLS1As-BuiltsLS1Division 2: Site WorkDemolition, Removals, & Salvage ItemsLS1Cut and Cap Existing 12" WaterlineEA8Retaining WallCY179GradingLS1Pump Station & Retaining Wall, Excavation Shoring, Backfill & HaulingLS11/2" Decomposed Granite, 1-1/2" Thick Over Compacted NativeCY120Pavement removal and replacementSY90Division 3: ConcreteSteel Reinforced, Cast-In-Place Concrete Pad, Electrical BuildingCY20Steel Reinforced, Cast-In-Place Concrete Pad, Hydro TankCY2Steel Reinforced, Cast-In-Place Concrete Pad, Disinfection EquipmentCY29Steel Reinforced, Cast-In-Place Concrete Pad, TransformerCY2Steel Reinforced, Cast-In-Place Concrete Pad, SESCY4Steel Reinforced, Cast-In-Place Concrete Pad, Evaporative CoolerCY2Steel Reinforced, Cast-In-Place Concrete Pad, Entry Pads CY5Steel Reinforced, Cast-In-Place Concrete Pad, Pump EnclosureCY40Pump Can Concrete EncasementCY23Pipe Concrete EncasementEA51/2" Sack Slurry BackfillCY254Sump Pump ManholeEA1Thrust CollarEA1Concrete Pipe SupportEA4Containment CurbLF75Precast Concrete Fill Valve VaultEA1Chlorine Injection ManholeEA2