Specifications include, but are not limited to: Architecture areas of Services Requested - A. Building Programming B. Preliminary Design C. Architectural Drawings and Specifications D. Construction Administration E. Project Close-Out and Warranty Walk-Thru F. Civil Engineering G. Storm Water Management Plan H. Drainage Summary I. Structural Design J. Landscaping Design K. Mechanical Design L. Plumbing Design M. Fire Protection Design N. Electrical Design O. Special Systems and Fire Alarm Design P. Transportation and Parking Q. Environmental Testing R. Geotechnical S. Soils Report; Additional Services Areas - A. Food Service Consultant B. Special Structural Inspection C. Survey D. Reports to School Facility Board E. Architectural Renderings F. Title Reports G. Street Light Design H. Fire Line Extension Plans I. Record Drawings; Architectural Services and Requirements - A. Preparation of complete contract documents and contract administration for the entire length of any given project including successful completion and acceptance by Litchfield Elementary School District, #79 (LESD). B. All work necessary for completion of all projects shall be in accordance with applicable provisions of the State of Arizona Building Code, latest edition, including all subsequent modifications and supplements and all requirements as specified by the Americans with Disabilities Act (ADA). C. Architect shall attend, when requested by Owner, meetings of the governing body of Owner for the purpose of discussing the schematics, drawings, cost estimates or construction of the Project. D. Architect may be required to provide appropriate engineering consulting services (i.e. mechanical, electrical, plumbing, civil, landscape, etc.). However, LESD reserves the right to approve or disapprove any consultant to be utilized. E. LESD has the right to select from a variety of construction procurement options including Design/Bid/Build, Construction Manager at Risk, Job Order Contracting, or Qualification Select Bidder List. The role of the architect and the scope of services required by LESD will be consistent no matter the procurement option selected. F. The architect shall be responsible to perform pre-construction services with the selected General Contractor. Pre-construction services shall be a cooperative process that will include the sharing of programming notes, budget development, estimating, scheduling, constructability analysis, etc...