Specifications include, but are not limited to: A. Preparation of complete contract documents and contract administration for the entire length of any given project including successful completion and acceptance by the District. B. All work necessary for completion of all projects shall be in accordance with applicable provisions of the State of Arizona Building Code, latest edition, including all subsequent modifications and supplements and all requirements as specified by the Americans with Disabilities Act (ADA). C. Architect/Engineer shall attend, when requested by the District, meetings of the Governing Board for the purpose of discussing the schematics, drawings, cost estimates or construction of the Project. D. Architect may be required to provide appropriate engineering consulting services (i.e. mechanical, electrical, plumbing, civil, landscape, etc.). However, the District reserves the right to approve or disapprove any consultant to be utilized. E. The District reserves the right to select from a variety of construction procurement options including Design/Bid/Build, Construction Manager at Risk, Job Order Contracting, or Qualification Select Bidder List. The role of the architect and the scope of services required by the District will be consistent no matter the procurement option selected. F. Under the Construction Manager at Risk option, the architect shall be responsible to perform pre-construction services with the selected General Contractor. Pre-construction services shall be a cooperative process that will include the sharing of programming notes, budget development, estimating, scheduling, constructability analysis, etc. G. In the event the District elects to use an alternative delivery method for construction services, such as Construction Manager at Risk or Job Order Contracting, it is understood that the architect will assist and support the selected contractor in developing detailed cost estimates and performance schedules. If the District chooses to use the traditional hard bid or qualified select bidder’s list method, the architect will assume the cost estimating and performance schedule functions.