The anticipated scope task is to be for a Right of Way Survey. Right of Way Survey: It has been determined that the north portion of the Results of Survey prepared in 2005 under R/W project U 093-B-703 did not adequately establish the stationing component when compared to the found R/W monumentation evidence. This was also true for the adjoining 2005 survey U 093-B-702. The U 093- B-702 stationing issue is being corrected by surveys for new projects F0737 (Big Jim Wash) and 093 YV 166 M6975, Black Canyon Wash – Alamo Road. Considering that this portion of US 93 is designated for future expansion and improvement for future I-11, R/W Group Management has authorized the use of M6975 funds to correct the issue on this remaining segment. The selected Consultant will prepare an R/W Survey from approx. MP 179.2 to MP 182.9, from the south line of Section 32, T10N-R7W to the R/W centerline of SR 71 within Sections 3, 4, 5, 10, 11 & 14 of T9N-R7W. The R/W Survey and Results of Survey drawing will be a verification/reconstitution/updating of a portion of the Results of Survey prepared for R/W project 093 YV 179 H4871 02R / U 093-B-703.