This project will reconstruct and realign the southern taxiways consisting of approximately 12,000 square yards (SY) of asphalt concrete (AC) pavement. It should be noted that the southern taxiways are currently unnamed and as part of this project the parallel taxiway portion has been renamed to Taxiway ‘J’ while the southern connector to Taxiway ‘D3’. The existing AC pavement is experiencing varying degrees of distress and is in need of reconstruction from the subgrade up through the pavement surface. Per the information available on ADOT’s Airport Pavement Management System (APMS) web application, the 2022 Pavement Condition Index (PCI) for the taxiway was 49, and projected to decline to 46 by 2024, indicating that major rehabilitation is recommended for this pavement.