Specifications include, but are not limited to: 2.1 Remove and discard existing wall shelving’s. 2.2 Remove and discard, door and components located between office (Room B-2) and project location. Frame in and install drywall on opening. 2.3 Repair, patch and paint wall surface in office (Room B-2) to match existing. 2.4 Repair and replace, damage carpet tiles and cove base in office (Room B-2) to match existing. 2.5 Install new framing and drywall, for new common wall. Install moisture resistant, drywall threw out the work areas. 2.6 Install 4” x 4” wall tiles at 6’ height in restroom. Tiles shall be ceramic, color sample boards and Grout Color Card shall be provided to DEMA. 2.7 Install frame in ceiling for hard deck. Ceiling shall be smooth (4-5) with no texturing, primed and painted. Ensure all lights, registers, fire control devices and any surface mounted devises are installed properly.