Specifications include, but are not limited to: The work included under this contract consists of furnishing all labor, materials, equipment, supervision, and other facilities necessary to rebuild Substation 3. This is a two-phase project. Phase I/Schedule A: WS-8692 (ME.20964) requires installation of two 35kV switch cabinets to tie in sub-transmission circuits 1030 and 830 from Plant 1 into a SCADA controlled switch cabinet for the purpose of serving the Central Business District (CBD) loads currently fed from Breaker 30 at Sub 3. This project will also allow Breaker 30 to be replaced and provide a 35kV source to Sub 3 to be coordinated with the rebuild of Substation 3 (Phase 2/Schedule B) on WS-8654 (ME.11074).The site of this project is located near Barrow Street and East 2nd Avenue. It is the responsibility of the bidder to prepare the bid so that all materials and/or fittings shall harmoniously conform to the intent of the contract drawings, specifications, and Special Provisions.