Specifications include, but are not limited to: sliplining 62 linear feet of 30-inch corrugated metal pipe (CMP) with 8-inch Class 52 Ductile Iron Pipe (DIP); grouting of annular space between the 30-inch CMP and 8-inch DIP; removal of an existing Type B sanitary sewer manhole and replacement with a new Type A sanitary sewer manhole; removal and disposal of 40 linear feet of asbestos cement concrete (AC) pipe and replacement with 40 linear feet of 8-inch C-900, DR-18 PVC pipe; furnishing and installing 174 linear feet of 8-inch Cured-InPlace-Pipe (CIPP), installation of a new drop connect, and modification of an existing Type B sanitary sewer manhole. Additionally, the Work includes but is not limited to performance of final CCTV inspection to ensure proper installation of new facilities, sewer flow control, dye testing, utility pole shoring, landscaping, and the restoration of all affected areas