Specifications include, but are not limited to: The SOT current facilities are in need of condition assessment. The ore loader was last inspected in 2013 by R&M Consultant. The SOT is currently being held in standby. The Authority requires a i) condition report on the minimum requirements for immediate and continued operation of its existing capacity from standby and ii) a cost effective 5 year maintenance plan to ensure that the SOT is fully functional and in compliance with all applicable permits, conditions and regulations through the end of its initial lease term expiring in [March] 2023. The Authority does not intend to upgrade or to implement large capital improvements, only to continue to utilize the existing asset. The Authority requires a contractor to review and provide a report that provides a cost effective approach to preserving the SOT, as-is.