Specifications include, but are not limited to: Designing a replacement of the generator control panel in the ERS with new and improved SCADA interface functionality for remote operations and monitoring. The existing control panel is nearing the end of it's useful life and does not have a functional interface between the control panel and SCADA. The generator cannot be remotely started or adjusted and operators manually start the generator. The new control panel will provide new and improved SCADA interface functionality for remote operations and monitoring of the ERS. The project also includes replacing the electrical actuators on 5 motorized valves (two needle valves, two isolation valves, one sleeve valve) where the raw water enters the plant.