Specifications include, but are not limited to: The work in the National Guard Readiness Center includes but is not limited to the removal,demolition and disposal of three (3) existing Weil McLain fuel oil boilers. Weil McLain statesthat their asbestos use ceased prior to 1986, the existing boilers were installed in 1987 – therepresentative from Weil McLain stated there is no asbestos containing material provided bythe manufacturer for assembly of the existing Kotzebue boilers. Insulation on the pipingcontains no known ACM. Replace with two (2) fuel oilboilers sized based on Contractorcalculations for output requirements (@28,000 SF facility).The new boilers shall, atminimum, meet an 85% efficiency rating. The installation shallinclude a new double wall 50-gallon fuel oil day tank plumbed per manufacturersspecifications. The installation shallinclude a new air separator installed per manufacturersspecifications. Connect new boilersand controls to the existing DDC system. (We haveautomatic and manual control throughthis system).