Specifications include, but are not limited to: preventative maintenance project on the Kodiak Harbor Channel Bridge. The project would resurface the concrete deck with a polymer concrete overlay, field metalize all structural steel surfaces, replace bridge deck drain grates, repair concrete bridge barriers and steel connector plates, and replace utility hangers. The project would also reconstruct the asphalt concrete at both approaches, replace the concrete sidewalk, curb, and gutter at the north approach, replace an existing storm drain pipe and structure, and restore and embankment slope. The project is necessary to reduce maintenance costs and address deficiencies identified on the 2018 Bridge Inspection Report.