Specifications include, but are not limited to: A. Review of existing plans, studies, technical memoranda and record drawings. B. Prepare a Project Management Plan within 14 calendar days of Notice-ToProceed. AWWU at its option may change the scope of the services. C. Conduct an on-site visit and initial facility survey of the EWTF and solicit input from the EWTF personnel. D. Solicit input from stakeholders. E. Identify AND ACQUIRE all required agency permits, approvals or waivers. All fees for these permits will be paid for by AWWU. F. Prepare a design study report that identifies options and their associated costs. This design study report shall include a recommendation by the designer and will serve as the basis for design. G. Prepare design submittals to include plans, specifications and construction cost estimates at the 35%, 65%, 95% and 100% design completion. Coordinate the design with AWWU internal reviews. The project team design must be coordinated with other projects that may currently be in design or construction. H. Prepare construction contract documents including all related disciplines. I. Provide assistance and updates to the final construction documents and cost estimate through the construction bidding phase. J. Additional Services: AWWU may include additional services relevant to this project. Examples of such services may include, but are not limited to, more in-depth examination of a process or regulation. The Contractor shall proceed with additional services only with prior authorization of the Owner and after mutual agreement on the scope and compensation. In addition, AWWU reserves the option to amend the contract to include services during construction.