Specifications include, but are not limited to: The Work for this Contract generally consists of Demolition and install new systems (process mechanical, building mechanical, electrical, instrumentation and control, and plant control) as indicated on the Drawings and included in the Specifications. Furnish and install new equipment located at the Intake and Portal Valve Vault structures. Furnish and install new equipment and provide services from the original equipment manufacturers (OEMs). Sequence Work activities in a manner to minimize the number and duration of require shutdowns of water conveyance and treatment facilities. 1. Demolition and install new systems (process mechanical, building mechanical, electrical, instrumentation and control, and plant control) as indicated on the Drawings and included in the Specifications. 2. Furnish and install new equipment located at the Intake and Portal Valve Vault structures. 3. Furnish and install new equipment and provide services from the original equipment manufacturer’s (OEMs). 4. Sequence Work activities in a manner to minimize the number and duration of require shutdowns of water conveyance and treatment facilities. 5. The OWNER’S ENGINEER and their resources will provide Plant SCADA system integration services, including configuration of the new instrument devices furnished and installed by the CONTRACTOR, and creating or installing new control programming in the Plant SCADA system and Main Control Panel. 6. Provide support resources to the OWNER and OWNER’S ENGINEER to verify the function and performance of new equipment and instruments installed in this Project, and the functional character of process operational cycles using that new equipment.