Specifications include, but are not limited to: Terminal Building Improvements: Services under this contract include architectural and engineering design in support of the terminal building and sidewalk improvements. Interior work includes, but not limited to, remodeling the bathrooms & ticket counters of the main building, replacement of interior doors, and associated electrical and mechanical work. Exterior work includes roof & gutter system replacement on the main building, exterior door replacement, and curb/gutter sidewalk improvements. Electrical Improvements Services under this contract include the evaluation and the design of improvements for the AMHS ferry berth electrical shore tie system. The primary power supply to all 3 ferry berths (West, East & Stern) is located in the utility building near the West Berth. The power supply was originally constructed in the 1998 Staging Area project and was modified in 2004 to relocate shore power from the East Berth to the new Stern Berth. Other modifications in 2008 included transformer upgrades and heat trace upgrades. Currently there is no shore power to the East Berth, and there are reports of frequent breaker popping on the West Berth system.