Specifications include, but are not limited to: 3.1.1 All design and construction in their entirety will comply with this RFP, the 2015 MOA Standard Specifications (MASS), and with the latest edition of all applicable codes, ordinances, standards, and all associated addenda. The RFP provides additional requirements to MASS. If there is a discrepancy between the RFP and MASS, the RFP shall govern. The Contractor may apply for modifications to these documents. The acceptability of these modifications will be at the sole discretion of SWS. 3.1.2 Data Gathering: Contractor shall review the information provided by SWS for the purpose of completing the required design and construction. If the Contractor determines that additional technical data is required to complete the Work it shall be at the Contractor’s own expense. 3.1.3 Design Survey: The Contractor is responsible for the completion of a design survey at the project site. SWS will provide a site plan template for the use of the Contractor. If the Contractor elects to utilize the site plan template it does so at its own risk. The burden is on the Contractor to provide complete and accurate survey control documents, as necessary to fulfil all requirements and conditions from the Municipality of Anchorage Building Safety Division. The Contractor shall be responsible for signing and stamping the survey control sheets for this project.