Specifications include, but are not limited to: The Work that is presented in the Bid Proposal for this Contract consists of the rehabilitation of approximately 1,307 feet of 15-inch corrugated metal pipe (CMP) sewer main with Contractor furnished and installed cured in place pipe (CIPP); 5,228 feet of condition assessment, pre-rehabilitation, post rehabilitation, and acceptance CCTV inspections; sewer main and manhole cleaning; robotically reinstating 14 sewer service connections; installation of 1 deep service riser and connection to sewer main; rehabilitation of 5 existing sewer manholes including removing and replacing cone sections, grade rings, ladder rungs, and frames and covers; temporary sewer main flow control; clearing and grubbing for easement access; restoration of affected asphalt paved streets, P.C.C. curb & gutter and sidewalk, fencing, signs, and bollards; construction survey; and traffic maintenance.