The plowing and sanding of five (5) parking lots and associated sidewalks. Areas of work consist of the Fire Department, the Police Department, City Hall, Library, and Skyline Drive Fire Station. Snow Removal: The basic services shall require the contractor to remove snow from the identified facilities when each snow event accumulation equals or exceeds two inches, (2”), in depth. Additional services may be required, by the individual facilities, upon notification by the affected facility. Exception to the 2” requirement is the Skyline Drive Fire Station which requires a minimum 6” of snow depth. The contractor shall not plow the same area more than twice in a 24-hour period unless instructed to do so by the City.