Consisting of approximately 15,260 C.Y. of Unusable Excavation Removed from Site; 24,750 Tons of Classified Fill and Backfill; 3,231 L.F. of Curb and Gutter Removal; 7,713 S.Y. of A.C.P. Removal; 1,570 Tons A.C. Pavement; 3,312 L.F. P.C.C. Curb and Gutter Installation; 8 Curb Ramp Installations (various types); 63,210 S.F. Insulation Installation (R9); 6,030 S.F. Insulation Installation (R-4.5); 819 S.Y. P.C.C. Sidewalk (Various Thicknesses); 382 LF of Storm Drain Pipe (Various Types & Sizes); 1,706 LF of Subdrain Pipe (Various Types & Sizes); 11 Footing Drain Services; 23 Storm Drain Manholes (various types); 15 Storm Drain Catch Basins; 1 Oil and Grit Separator; 11 Roadway Luminaires; Landscaping; and related work.