Specifications include, but are not limited to: 1. Construction survey as required 2. Contractor is responsible for all utility locates 3. SWPPP compliance (provide and maintain all BMP’s, required inspections, etc.) 4. Clearing and grubbing (clearing limits shown on Civil & Landscape Sheets) 5. Excavation and removal of unsuitable materials down to native soils per geotechnical recommendations (Approximate limits of excavation is indicated on the drawings), slope and stabilize excavation areas as required for safety 6. Water service from existing water main into the mechanical room 124 as shown on A1.01. 7. Two each fire hydrants (one off of existing water main and one off of the new water line) 8. Sewer service from existing main to 8” YCO adjacent to building including all required manholes 9. Storm drain service from existing ditch to 6” YCO adjacent to building including storm drain overflow structure