• Construction and installation of all outside plant (OSP) infrastructure per SGV’s issued construction documents. • Buried and aerial fiber installation, including placement of vaults, handholes, and customer drops. • TCC will supply the ground lay fiber, available for contractor pickup in Fairbanks. The contractor is responsible for providing all other materials required to complete the ground lay installation. This includes, but is not limited to, splice enclosures, splice kits for the aerial-to-ground transition, and any additional hardware, consumables, or installation accessories necessary to complete the work in accordance with project specifications. • Complete the Moose River & Moose Creek bore as per the design and specifications provided by TempTel (see Attachment H). This work shall include the installation of ground vaults, splice enclosures, splice kits, and any other necessary hardware and materials required to complete the bore and fiber transition in accordance with the project requirements. • Clarification – TempTel Design (Attachment H): On Sheet JN-09, the symbol BFO 48 (sc) refers to a 48-count Buried Fiber Optic cable with a saw cut (sc) installation method. • Fiber optic splicing, termination, and comprehensive documentation of circuits. • OTDR and loss testing of all fiber connections, with results submitted for review. • Coordination with the inside plant contractor to bring the network into service. • Collaboration with the designated backhaul provider to enable final service activation. • Restoration of all disturbed work areas to original or better condition. • Adherence to construction specifications. • Completion of all punch list items and successful final acceptance testing.