Specifications include, but are not limited to: A. Provide continuous pathway system for all low voltage cable systems. Where multiple cable systems (e.g. telecom, intercom, video) are installed along the same J-hook pathway, provide separate J-hooks for each system. J-hooks may utilize the same vertical support. B. Coordinate all pathway runs with other trades prior to installation. Report conflicts to ASD Project Manager. C. Maintain a minimum EMI separation clearance in conformance with Section 28 23 00. D. Support pathway from building to support structure or sub structure in accordance with Section 26 05 29. Do not support pathway from ceiling tiles, ceiling grid, hanger wires, ductwork, piping, or other equipment hangers that are not part of the cable pathway support system.