Specifications include, but are not limited to: A. Parking Lots 1. All lots and driveways must be cleared of all snow by 7:30am. 2. All lots and driveways must be sanded or ice free by 7:30am. 3. If conditions become icy from 7:30am to 6pm, contractor will, within 2 hours, provide sanding services to prevent vehicles or people from experiencing slip and fall conditions, being careful not to damage vehicles in the lot. B. Sidewalks, Stairs, Ramps, Entryways and Exits 1. All sidewalks and entryways must be cleared of all snow by 7:30 a.m. 2. All sidewalks and entryways must have ice melt or ice free by 7:30 a.m. 3. Services shall also be provided during the weekdays 7:30 a.m. to 5:00 p.m., when snow or ice is actively accumulating (2” or more), once at 11:00 a.m. and once at 4:00 p.m. The ACS representative may “call out” Contractor at other times as the representative deems necessary, such as when high winds cause snow drifting.