1. Mobilizing, demobilizing, to include acquiring a barge for transportation of the drill rig. 2. Site cleanup and providing “tundra mats” for overland transport of the drill rig in tundra areas as needed for land travel to the proposed well drilling site(s). 3. Drilling and installing 6-inch diameter steel cased well(s) with a track or wheel mounted drill rig. 4. Installing, at a minimum, 5-foot long well screen with a K-packer, gravel pack and blank casing in the completed exploratory water supply well. 5. Grouting of well casing to meet the ADEC Grouting requirements. 6. Developing and test pumping the completed exploratory well(s). The discharge of pumped groundwater to the ground surface must comply with State and Federal requirements for surface water discharge including the establishment of temporary erosion control measures. 7. Installing well casing stick-up approximately 24-inches above the ground surface with a secure locking sanitary well cap. 8. Abandonment/decommissioning of wells at the direction of the Department or Department Engineer), in compliance with ADEC requirements for well abandonment.