Specifications include, but are not limited to:The purpose of this project is to reconstruct Runway 2R/20L by shortening the length from 6,500’ to 4,500’ and meet B-II runway design code standards.Work will also include new runway and taxiway lighting, relocation of FAA navaids (REIL and PAPI’s), repave Taxiways C and Q, shift and repave Taxiways R and S, and installation of a gate across Taxiway B (Figure 1), Work to be performed may include preliminary design development and reports, NEPA environmental document and any required permits, public stakeholder meetings, bid documents, bid support and construction assistance. The work will be negotiated as needed and the Department and FAI may choose to perform any of these tasks or portions in-house.