The Consultant shall provide all professional engineering services necessary to prepare complete bid-ready construction drawings, specifications, bid schedule and engineer’s estimate with critical material lead times for construction of pavement, sidewalk, drainage, water and wastewater utility improvements for Taku Boulevard between Mendenhall Loop Road and the Aspen Avenue intersection. Services will include, but not be limited to, research, survey, engineering design, stakeholder, and neighborhood outreach. The scope of construction work anticipated includes improvements to the underground storm drainage and sewer collection system, replacement of the water system, road base, curb and gutter, sidewalk, pavement, and other miscellaneous improvements necessary for a complete project.