a. Perform a Facility Condition assessment. b. Develop a renovation design to include at least 3 bays to be lengthened, width enhanced to accommodate larger buses. c. Provide design plans for flat and level floors to accommodate heavy-duty stationery or heavy-duty mobile lifts. d. Provide assessment and plan to provide mechanical ventilation for diesel exhaust. e. Provide Assessment and plan to address domestic water which is reported to be brownish orange at drinking fountains. f. Provide assessment on electrical usage and plan for upgrading electrical services and improved lighting. g. Provide plans to convert existing pneumatic heating controls to DDC. h. Provide assessment on bus washing bay water tempering. i. Perform and provide full geotechnical samples for soil and water contamination. j. Perform Hazmat testing for ACM, Lead and PCB materials. k. Provide assessment on underground drainage full scope with video recording. l. Provide assessment on existing oil and water separator. m. Provide assessment of restroom fixture count. n. Provide cost estimate with 65% and 95% design submittal.