Specifications include, but are not limited to: A. Research B. Pre-Work Meeting with ADOT&PF C. Control Survey D. Aerial Photography/Photogrammetry E. Topographic/Planimetric Survey F. Bridge Site(s)/Drainage Survey G. Special Features H. Right-of-Way Survey I. Right-of-Way Mapping J. Preconstruction Surveying K. Post Construction Surveying L. Right of Way Engineering Closeout Services; Control surveys include establishing horizontal and vertical control points as directed by the Contracting Agency. The Contractor shall prepare a Survey Control Diagram (SCD) showing the results of the control survey. The SCD will be a recorded document, and as such, will need to meet certain criteria. All points used or tied as a part of these control surveys shall be included in the project coordinate file and shown on the SCD. SCD guidelines are available from the DOT&PF Survey Section.