Tanana Chiefs Conference (TCC) Energy Team is soliciting proposals from qualified Contractors to provide all labor, supplies, and equipment for the construction of seven (7) Battery Energy Storage Systems (BESS) and microgrid controllers (also known as IPP Controllers). These systems will be deployed across seven Interior Alaska communities: Venetie, Fort Yukon, Ruby, Minto, Grayling, Huslia, and Tok. ● The BESS control, management system, batteries, inverter(s), data monitoring and communication system must be compatible with the Comap InteliNeo controller and approved by TCC & the local utility before purchasing for reimbursement. ● The BESS must be designed for a minimum operational life 6,000 cycles. ● A site specific O&M manual and onsite training for local operators is required before final payment is issued. ● Electrical components shall be within weatherproof enclosures marked with the environmental rating suitable for the type of environment they will be installed in compliance with, or exceeds, NFPA 70. ● Balance of Systems (wiring, switches, disconnects, conduits and connections, communications, etc.) shall be installed in an appropriate location that meets the following criteria: o Professional and permanent with appropriate conduit/connectors/etc. o Ease of maintenance access and monitoring o Efficient operation o Low operating losses o Secured location and hardware o Emergency stop located inside or outside ● All components shall be new. Used, reconditioned, after-market, or greymarket products or equipment are not acceptable. ● All equipment warranties must be transferred to the Owner at commissioning.