Work shall include, but is not limited to, the furnishing of all personnel, supervision, equipment, tools, and transportation necessary for the snow removal services in the areas described below. Sanding is the responsibility of the contractor. Sand size shall be no larger than 3/8-. Postseason lot clean-up is a requirement that will be considered an overhead cost. Lot clean-up includes the removal of trash and other debris, along with leveling. Clean-up shall take place multiple times as needed to maintain a clean appearance. In all areas where buses operate, the bus routes are to be a priority. AREA I – This area consists of Atigun Drive, Salcha Way, Rudolph Street, Hobart Street, access to South Central Pump Station City Water Well #6, the Airport Parking lot and Zurich Loop Road, North Sawmill Drive, Mill Street, and 9th Street. Children are present, especially during early morning and after school. The Salcha Way area is susceptible to high winds and drifting snow. The school bus yard is located on North Sawmill Drive, and snow removal will need to be done in a manner that doesn’t delay or disrupt bus services. AREA III – This area consists of Corbin Creek Subdivision, off-highway parking for access to Alpetco Road and off-highway parking at the ballfields. Snow storage lots are available on each residential street within this subdivision. Again, this is a residential area where children are present, especially during early morning and late afternoon. Please use caution.