Contractor will furnish all labor, materials, and equipment to perform all work items described below in accordance with the construction drawings, specifications, As built surveys, and locally adopted building codes. Final driveway grade to be completed by others, CIHA will coordinate a walk-through inspection prior to request for grade services; contractor will correct any deficiencies. Deliver, place, compact, and smooth D-1 gravel material. Lay, compact, and roll asphalt paving at a minimum of 2” thickness. Deliver and install concrete wheel stops (when required). Layout and apply pavement markings for parking stalls, ADA parking stalls and crosswalks (when required). Subgrade Gravel - Provided by others and is not part of ITB. D1 – place and compact minimum 2” thick layer of D1. Asphalt Compacted asphalt shall be a minimum of 2” thick. Asphalt will be compacted with a minimum 5 ton roller. Wheel Stops Precast concrete 7’L x 8”W x 6”H Anchored with (2) #5 x 12” rebar Marking/Striping Lay out lines, as shown on provided drawing. Paint shall be applied with appropriate airless striping machine, or equivalent. Lines shall be straight and four (4) inches in width. ADA parking stall markings shall be marked per code.