Specifications include, but are not limited to: Provide construction services consisting of approximately 480 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 36 Curb Ramps; 1070 L.F. of Curb and Gutter Removal and Replacement; 20 Tons of A.C. Pavement; 130 S.Y. of Pavement Removal; 5 Catch Basins; 86 L.F. of Storm Pipe Removal and other related work.; Installation of flexible delineators at the end of culverts, ends of retaining walls, field inlets, and other locations that may be hazardous or should be delineated for snow removal operations as determined by the Engineer.; Remove Sidewalk or Concrete Apron per SY, QTY 480; Remove Curb and Gutter per LF, QTY 1,070; Remove Pavement per SY, QTY 130; Unusable Excavation per CY, QTY 70; Bedding Material (Class D) per LF, QTY 86; Classified Fill and Backfill (Type II) per Ton, QTY 60; Classified Fill and Backfill (Type IIA) per Ton, QTY 30; Leveling Course per Ton, QTY 20; P.C.C. Curb and Gutter (All Types) per LF, QTY 1,070; P.C.C. Sidewalk (4-inch) (Standard Finish) per SY, QTY 30; P.C.C. Sidewalk (6-inch) (Standard Finish) per SY, QTY 120; P.C.C. Curb Ramp (All Types) per EA, QTY 36; P.C.C. Retaining Wall (Class A-3) per CY, QTY 3; A.C. Pavement (Class E) per Ton, QTY 20; Furnish, Install, and Televise Pipe (10-inch, CPEP-S) per LF, QTY 86; Connect to Existing Storm Drain Manhole or Catch Basin per EA, QTY 2; Construct Catch Basin per EA, QTY 5; Remove Manhole or Catch Basin per EA, QTY 5; Construction Survey Measurement per LS, QTY 1; Two-Person Survey Crew per Hour, QTY 20; Remove Pipe per LF, QTY 86; Remove and Reset Fence per LF, QTY 15; Standard Sign per SF, QTY 220