Specifications include, but are not limited to: All Tanani Bay Subdivision roads: Dolphin Street and Otter Avenue shall be cleared of snow to a minimum width of twenty-four feet whenever snow accumulates to a depth of six inches or more and remove ice and hard packed snow from the areas. The contractor shall also plow the turnaround at the end of Otter Avenue. The Borough shall pay for this work on a lump sum, per-job rate basis. The Borough Manager may negotiate special conditions to the contract as may be in the best interests of the Borough. The Borough may choose to remove snow in this area at any time, at their discretion. The contractor shall be responsible for the inspection of the area prior to snow fall. The contractor shall be responsible for the repair, replacement or reconstruction of any damage to public or private property caused by the contractor. The contractor is responsible for and shall include in its quote amount all costs for equipment, labor, maintenance, fuel, insurance, mobilization and any other cost necessary to perform the work. Contractor will provide a price per time for: Sanding Plowing Bermback