Living room/Kitchen/Laundry Area (approximately 950 sf): • Removal, disposal, and replacement of drywall. All new drywall must be finished with joint compound mud, taped, sanded, textured with Orange Peel, primed and painted to a level 4 finish (paint to be provided by AHFC). • Removal, disposal, and replacement of one exterior fiberglass door, door frame, and exterior J-channel. Door to be 3-0 RHIS six panel, double bore, with brushed nickel hinges. • Removal, disposal, and replacement of rough in electrical wiring, boxes and components as necessary in living room. • Replace vapor barrier and insulation where needed along exterior wall. Hallway, Bathroom, Bedrooms (2) (approximately 950 sf) • Cleaning of existing drywall to remove all soot/debris and brought to pre fire condition. Cleaned drywall to be textured with Orange Peel, primed and painted to a level 4 finish (paint to be provided by AHFC). • Living room has vaulted ceiling existing one layer of 5/8" drywall, party existing one layer of 5/8" drywall, exterior wall existing one layer of 1/2" drywall, and remaining interior wall existing one layer of ½" drywall. • Removal, disposal, and replacement of five vinyl windows along with interior PVC trim and sills. New windows and trim to match existing windows and trim. • Cleaning of all LVP flooring throughout entire unit to prevent spread of fire soot/debris during rehab. AHFC contracted flooring installer will remove and replace LVP flooring. • Rerouting attic light switch location from hallway to attic. • Removal, disposal, and replacement of wainscoting along both sides of hallway. • Removal and disposal of three interior hollow core doors and trim. Replace with 3-0 solid core, six panel, primed white interior doors, with brushed nickel hinges (2 LHIS, 1 RHIS). • Removal, disposal, and replacement of 5-0x3-0 ADA compliant accessible roll-in shower assembly. Shower head, handle, and drain must be connected to plumbing.