Specifications include, but are not limited to: Demolition of existing finishes, walls, plumbing, electrical, mechanical, and sprinklers. Installing new walls, doors, finishes, plumbing, mechanical, and electrical. Mostly creating a shell space. The work will be performed using Infection Control measures so that clinical operations can continue without interruption. Adjacent spaces are sensitive to noise and vibrations and may require measures to mitigate these issues. The project is located contiguous with fully functioning (Heart & Vascular Labs treating patients) and Contactors must have significant experience in working in a Hospital clinical environment and have knowledge and experience with implementation, monitoring, and maintaining Infection Control and Interim Life Safety Measures.