1. Mobilization and demobilization. 2. Perform demolition work as indicated in the drawings. 3. Furnish and install automated isolation plug valves on existing 8” auger drain lines for both centrifuges. 4. Install OWNER’s procured motorized actuators on the diverter valves in the basement. 5. Upsize the sump pumps and associated piping, valves and appurtenances in the basement sump pit. 6. Create new sump pit in the basement between the truck containment area and the rollup door along with required submersible pump and piping. 7. Upsize the sump pumps and associated piping, valves and appurtenances in the wet well next to Thickener No.1. 8. Furnish and install new conveyors system, including inclined conveyors, offload conveyors, with interconnecting chutes and the supports of all equipment. 9. Create a new offload bay in the basement, including a hopper with supports, a new opening on the north wall with motorized roll-up door installed, retaining wall, and concrete driveway connecting to the existing roadway. 10. Re-route service water, drain and electrical utility lines as indicated in the drawings. 11. Furnish and install new air compressor in the operation floor. 12. Furnish and install new HVAC system in the operating floor and basement with the associated monitoring and alarm systems. 13. PLC upgrade for the existing centrifuge control panels. 14. Electrical, instrumentation and controls, and integration with SCADA associated with the above-mentioned work.