Loading...
Skip to main content
< Back to results

Rollup Door Replacement - Fire Station No.1


Location
Alabama
Publication Date
03/12/2019 07:48 AM EDT
Closing Date
03/22/2019 04:00 PM EDT
Issuing Organization
City of Mobile
Solicitation Number
Description

Specifications include, but are not limited to: 1) Steel Rollup Door shall be, Rolling Steel Model FF, Duracoil Standard, as manufactured by the Raynor Garage Door Company. Equal products of other manufacturers will be acceptable only if approved by Owner prior to receipt of Quotes. Requests for approval must be submitted in writing no later than three (3) days prior to the date and time established for receipt of Quotes. Approvals will be issued to all bidders in the form of a written addendum. 2) Contractor shall coordinate all work sequences with the Project Manager and Fire Department staff to minimize disruption of Fire Department activities. 3) Contractor shall make every effort to remove existing and install new door on same day. If new door cannot be installed on same day, Contractor shall provide temporary opening protection. 4) Contractor shall be responsible for removal and disposal of all demolished materials, trash and other construction debris off site. 5) Rollup Door shall withstand the effects of gravity loads, and the following loads and Stresses within limits and under conditions indicated according to ASCE/SEI 7. Wind Loads: Wind Load : 20 lb/ square foot

Source
http://www.cityofmobile.org/bids/?id=1918 (opens in a new window)

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids