Specifications include, but are not limited to: For constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on I-65 from south of the CR-222 Overpass to a point near the Hurricane Creek Bridge northwest of South Vinemont. Length 11.491 mi. 206D001 28,597 LF Removing Guardrail 206D033 2,979 LF Removing Cable Guiderail 206E000 28 Each Removing Headwalls 206E008 122 Each Removing Guardrail End Anchor (All Type) 210A000 620 CUYD Unclassified Excavation 210D001 524 CUYD Borrow Excavation (Loose Truckbed Measurement) 214A000 86 CUYD Structure Excavation 214B001 35 CUYD Foundation Backfill, Commercial 405A000 84,367 Gal Tack Coat 407B000 25 Mile Joint Sealant For Hot Mix Asphalt Pavement 408A053 350,447 SQYD Planing Existing Pavement (Approximately 2.10" Thru 3.0" Thick) 408B000 251,949 SQYD Micro-Milling Existing Pavement(Approximately 0.00" Thru 1.00" Thick) 408B001 211,888 SQYD Micro-Milling Existing Pavement(Approximately 1.10" Thru 2.00" Thick) 410H000 2 Each Material Remixing Device 410I000 2 Each Smoothness Testing, Certified Inertial Profiler 420A015 17,008 Ton Polymer Modified Open Graded Friction Course 420B000 95,961 Gal Open Graded Friction Course Tack Coat