Specifications include, but are not limited to: Providing modular playground equipment and installation FOB Opelika in an amount not exceeding $20,000.00. 2.1 All play equipment shall be IPEMA certified, and meet all current CPSC, ASTM and ADA, 1487-95 guidelines. 2.2 All equipment shall be installed by a factory trained and certified installer. Proof of certification must be included with proposal. 2.3 A copy of Manufacturer’s Warranty shall be included with proposal 2.4 Proof of Manufacturer's Product Liability Insurance shall be included with proposal 2.5 The City will accept up to two (2) layouts from each proposer on separate proposal forms. Upon acceptance, the City reserves the right to make minor changes to the selected design within the project scope and budget.