Specifications include, but are not limited to: The Hughes Road Widening Project base bid consists of (a) widening of the existing three-lane roadway to a five-lane roadway section extending from just north of the intersection of Old Madison Pike to Millsford Drive, (b) replacement of the traffic signal located at Hughes Road and Eastview Drive, and (c) construction of an eight-foot-wide sidewalk located on the west side of Hughes Road. Existing pavement will be milled/planed and resurfaced. Storm water infrastructure will be installed as part of this project. The project includes all work necessary to complete the project including clearing and grubbing, stripping topsoil, unclassified excavation, storm drainage, gravel bedding, concrete sidewalk, and sodding. The project must conform to ADA requirements. Contractor must perform work under traffic using MUTCD standards for traffic control. Both directions of traffic must be maintained throughout the project.