Specifications include, but are not limited to: Bathroom Repairs $_______________________ _ Remove the flooring, tub surround, wall covering, medicine cabinets and existing tub in the bathroom. Replace all rotten, weak, or substandard framing and subfloor. _ Perform all framing, reinforcing, and blocking for walls to accommodate grab bars. Insulate the exterior wall and install, finish and paint, MR drywall on all bathroom walls. Paint entire bathroom. (color is owner’s choice) _ Replace existing bath tub with same size Shower base. _ Install new underlayment, and sheet vinyl cover. The installed vinyl will have a minimum 25 year warranty. No torn or patched vinyl will be accepted. Install finished shoe molding. (color & style is owner’s choice Ceiling Repair $_______________________ **Kitchen & Pantry Contain Lead Based Paint, Do Not Disturb** _ Remove all existing drop ceilings and ceiling tile. _ Build an attic access in a central location complete with trim and lay in panel. _ Patch all ceilings throughout the entire house (Excluding the kitchen & small pantry between the kitchen and dining room) with drywall. Tape, sand, prime and paint all ceilings. (white ceiling paint) Weatherization $_______________________ _ Add additional attic insulation to bring the total R Value up to R30. The insulation must be evenly distributed, and all soffit vents will remain open and uncovered.