Specifications include, but are not limited to: 1. Providing all labor, equipment and materials as required for the installation of new campus-wide single mode fiber optic telecommunications infrastructure. 2. Install new single mode fiber optic cabling utilizing new and existing conduit and abandoned steam piping infrastructure. 3. Install four (4) new telecommunications handholes. 4. Install new telecommunications ductbank from existing manholes CMH-4 to existing manhole CMH-5 via new telecommunications handholes HH-16 and HH-17. 5. Install new telecommunications ductbank from Bibb Graves Hall to existing handhole HH-4 via new telecommunications handholes HH-12 and HH-13. 6. Install two (2) new freestanding telecommunucations racks, thirteen (13) new wall mounted telecommunucations racks and twenty (20) new wall mounted single mode fiber optic patch panels. 7. Terminate new single mode fiber optic cabling in new or existing telecommunications racks on new single mode fiber optic patch panels.