Specifications include, but are not limited to: The Work of the project includes, but is not limited to: First Level: selective demolition, installation of new maple flooring, bases and transitions with graphics, guardrail, doors, ramps, paint and hardware, and electrical and data as required for Owner supplied new Scoreboard; Second Level: prep existing polyurethane floor for installation of new built up athletic flooring with associated bases and transitions, modifications to bleacher tracks run, guardrails, paint and ceilings, electric and mechanical for installation of new scoreboard as specified and as indicated on the Drawings; coordination and supervision of the entire project; and all related work, as indicated in the Bid and Contract Documents.