Specifications include, but are not limited to: Water and Sewer Fund Generators 1 20 Hours Technician Hourly Rate for Diagnostic Purposes Directed by City of Tuscaloosa $ 2 204 Each 3 Month Inspection-inspect unit and check all fluid levels, check for proper operation of all related components to include but not limited to transfer switch, battery charger, block heater, fuel transfer pump, exhaust system and rain flaps. $ 3 10 Each Run unit online for minimum of two hours and under load to complete online run. THIS WILL NOTE BE A LOAD BANK TEST (See Summary of Work 1.03.D) $ 4 21 Each Yearly Engine Oil Analysis of all Diesel Powered Generators $ 5 51 Each Changing of Oil in Each Generator Once Per Year $ General Fund Generators 6 20 Hours Technician Hourly Rate for Diagnostic Purposes Directed by City of Tuscaloosa $ 7 136 Each 3 Month Inspection-inspect unit and check all fluid levels, check for proper operation of all related components to include but not limited to transfer switch, battery charger, block heater, fuel transfer pump, exhaust system and rain flaps. $ 8 10 Each Run unit online for minimum of two hours and under load to complete online run. THIS WILL NOTE BE A LOAD BANK TEST (See Summary of Work 1.03.D) $ 9 12 Each Yearly Engine Oil Analysis of all Diesel Powered Generators $ 10 34 Each Changing of Oil in Each Generator Once Per Year $