THIS IS TO BE AWARDED OFF OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.
STATEMENT OF WORK (SOW)
FOR
USCGC WEDGE Renew Piping Insulation, Overhead Insulation and Conduct Overhead Repairs
WEDGE has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
The 75’ WLR asset, USCGC WEDGE needs approximately 500 linear feet of pipe insulation, 1500 square feet of overhead insulation, and 300 sq ft of overhead panels.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC WEDGE (WLR 75307). The Contractor shall provide all labor, materials, and tools necessary to install insulation and bulkhead panels.
Table 1 -Pipe Insulation Renewal
Description
(System/ Pipe Diameter/ Linear Feet)
Location
Drawing
Tender Chill Water/ Potable Water Piping / .5 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / .75 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / .875 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / 1 in / 100 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / 1 .25 in / 125 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Waste Water Piping / 1.5 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Waste Water Piping / 1.75 in / 25 ft
Galley/Mess deck/Crew Berthing/ Crew
See below
Tender Waste Water Piping / 2.0 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Table 2 – Overhead Insulation Renewal
Description
(Area/Approximate Square feet)
Location
Insulation Material
Overheads/1500 sq feet
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
BFG 261 (MIL-C-20079) or equivalent
Table 3 – Overhead Repairs
Description
(Area/Approximate Size)
Location
Drawing
300 sq ft of overhead panels
Galley/Mess Deck
See below
-
- OBJECTIVE
The goal is to return CGC WEDGE habitability areas to an appropriately insulated area.
-
- APPLICABLE DOCUMENTS
-
-
- Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
Coast Guard Drawing 75D-WAGL-3801-1 Vent Heating & A/C
Coast Guard Drawing 75D-WAGL-3901-1, Insulation & Sheathing Schedule (75306-75307)
Coast Guard Drawing 75D-WAGL 3902-1 Rev 1, JOINER DETS ENG RM (75306-75307
Coast Guard Drawing 75D-WAGL 3902-2 Rev 2, JOINER DETS MN DK & UPPER DK (75306-75307)
Coast Guard Drawing 75D-WAGL 3902-3 Rev 2, JOINER DETS WHEELHOUSE (75306-75307)
- SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC WEDGE (WLR 75307) in Mobile, AL.
2.1 RENEW CHILLWATER PIPING IINSULATION
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
-
-
- Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
-
-
- Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
Although most of the chill water piping is exposed due to previous remediation work; the Contractor will have to remove some overhead and bulk head paneling to access some of the piping.
-
-
- Renewal. The Contractor shall renew all piping system insulation identified in Table 1 and using the relevant Coast Guard Drawing(s) as guidance.
NOTE
Although pipe lengths, routes, and sizes are detailed in the specified drawings, the as-built configuration may vary slightly in routes, lengths, and sizes.
-
-
- Removal. The Contractor shall remove all existing insulation material over the designated pipe surfaces, including associated pipe hangers, valves, fittings, and flanges.
-
-
- Disposal. The Contractor shall dispose of all removed materials in accordance with all applicable federal, state, and local regulations.
NOTE
Other surfaces/fittings affected include: brackets, bulkhead penetrations, flat work, and all other protrusions or fixtures that will condense due to relative humidity from surrounding atmosphere.
-
-
- Surface preparation. The Contractor shall clean all exposed pipe and pipe component surfaces with a soft bristle brush and a mild detergent solution to remove all visible surface contaminants.
-
-
- New insulation installation - interior refrigerant, hot water and cold and chill water piping systems (Temperature Range: -20 to +180 Deg. F). The Contractor shall install new insulation material over the exposed pipe surfaces, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in NAVSEA Drawing 804-5959214; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683, Tables S1.1 and 5.
-
-
- Preservation. The Contractor shall paint the newly installed insulation system, in accordance with SFLC Std Spec 6310, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).
2.2 RENEW OVERHEAD INSULATION
The Contractor shall ensure all pipe insulation has been renewed by preforming a walkthrough of all spaces identified in section 2.1 with the Engineer Petty Officer (EPO) or the EPO’s designated representative.
-
-
- Renew insulation. The Contractor shall renew/install overhead insulation as identified in Table 2 and using the relevant Coast Guard Drawing(s) as guidance.
-
-
- Overhead Repairs The Contractor shall remove all overhead panels in all spaces identified (exception being Galley).
-
-
-
- The contractor shall identify all overhead mounted components to include but not limited to overhead cables, light fixtures, detectors, etc. and install brackets or new mounts to accommodate new overhead insulation.
- The contractor shall identify paint any remaining exposed surfaces as necessary.
-
-
- Renew galley overhead panels. The Contractor shall replace overhead panels that were previously removed as identified by ships force and Table 3.
- CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
- OTHER APPLICABLE CONDITIONS
4.1 PERIOD of Performance
The period of performance for this contract shall start April 1, 2025 and end no later than 14 days after commencement of work.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC WEDGE at 1500 15TH St., Mobile, AL 36615 unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.
4.4 TRAVEL
Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government.
5.0 GOVERNMENT FURNISHED RESOURCES
Bulkhead and Overhead panels previously removed during remediation efforts.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
- GOVERNMENT ACCEPTANCE PERIOD
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office.
RDD/POP: 04/01/2025- 04/14/2025
Delivery address and ATTN to:
MKC Zachary Mason
CGC Wedge (WLR-75307)
1500 15TH St.,
Mobile, AL 36615
251-214-5671