Specifications include, but are not limited to: (1) cold milling/planning of existing asphalt pavement; (2) removal of raised pavement joints, resulting from pavement movement over the many decades that have passed since the original concrete pavement was constructed; (3) the cleaning/filling/sealing of existing joints found within the limits of the concrete pavement found in the project area; (4) the removal and replacement of broken pavement, expected to be found in isolated areas of the existing pavement that is being rehabilitated; (5) the leveling of sunken areas of concrete pavement with hot mix asphalt pavement; (6) the application of an asphalt and stone surface treatment atop the prepared concrete pavement surfaces; (7) the application of a 2-inch hot mix asphalt overlay atop the surface treatment; and (8) the remarking/restriping of the pavement surface.